If you’ve got two or three quotes for automatic door installation Sydney and one is a mile cheaper, don’t select it yet. Nine times out of ten the difference is not because one company is greedy or simply cheap. It’s because they’ve included some things and not others. One quote includes the electrical connection, the glass, the sensors, commissioning tests. Another discreetly omits half of that.
This guide provides the practical checklist for lining quotes up side by side so you are comparing the same job and not three different jobs. It’s aimed at shop owners, practice managers, facility managers and strata committees who don’t install doors for a living but have to sign off on the spend.
How Can a Door Be So Different in Two Pictures?
An automatic door is not a single item. It is the operator (motor and control), track or arm, door leaves, sensors, locks, power, and the technician to fit it and commission it. That also includes the work around it: restoring the frame, taking down and disposing of the old door, out-of-hours operation, access gear, and the paperwork at the end.
Imagine a café owner in the Parramatta area replacing a heavy manual entry door:
- Quote A is a “supply and install automatic sliding door“.
- Quote B details the operator, glass, 2 motion sensors, a safety beam, a keyed lock, the removal of the existing door, and full commissioning.
Quote B is more expensive on paper, but Quote A may not be the cheapest in the end when extras are issued as variations.
The Scope Checklist: What Each Quote Should Articulate
Have each installer answer the same questions in writing. If information is lacking, it’s not necessarily a warning sign—it simply means you need to ask.
1. The Door System Itself
- Door type: Automatic sliding, automatic swing, or a retrofit operator applied to an existing door.
- Make/Model: The specific model or, at the very least, the operator class and whether it is suitable for anticipated traffic levels.
- Glass & Leaves: Clear statement of whether new door leaves and glass are supplied, or if current doors are being re-used.
- Finishing: Track, header, and cover finishing details so you know what the finished entry will look like from the street.
2. Activation, Safety and Access Control
- Door opening: Sensor, push button, touchless switch, keypad, or card reader.
- Safety sensors: Details on sensors installed to detect people in the travel line of the door, along with their placement.
- Locking mechanism: Whether it features an electric lock or manual lock, and how the door reacts once the working day ends.
- Access integration: Clear inclusion of whether connection to an existing access control or alarm system is included or must be completed by another trade.
3. Power and Building Works
- Electrical connections: Who provides the power point or flex cords at the header. In NSW, mains electrical wiring should be installed by a licensed electrician, so confirm if that is included in the quote price.
- Making good: Any cuts, patches, frame work, or paint work required after removal of the old door.
- Disposal: Extraction and off-site disposal of the old door and hardware.
- Finishing details: Any required glazing, safety decals, or signage on the glass.
4. Site Condition and Timing
- Work hours: Whether installation takes place during normal hours or after hours, and whether an after-hours surcharge applies.
- Site access: Access equipment, parking requirements, or building manager inductions.
- Site visits: Expected time on site and total required visits to complete installation.
- Building access: Provisions for pedestrian entry and exit while work is actively being completed.
5. Test, Handover and Support
- Commissioning: Safety testing and formal commissioning prior to handing over the door.
- Documentation: Handover documents provided, such as operating manuals, equipment specifications, test reports, and warranty certificates.
- Staff training: A short run-through with your team covering operation, locking, and resetting the door system.
- Warranties & Service: Warranty duration and coverage breakdown (parts, labour, call-outs), alongside routine service options down the line.
Exclusions: The Line That Changes Everything
There is always the odd caveat on an honest quote. That’s how it should be. What you need to know is that you can see what they are. Seek out expressions such as “by others”, “not included”, “subject to site conditions”, or “provisional”.
Some typical exclusions include:
- Electrical supply and mains wiring
- Builder’s works, structural opening adjustments, or masonry alterations
- Replacement of existing glass
- Specialist fire-related approvals
- Integration with third-party security systems
If one supplier has included these elements and another hasn’t, the two prices cannot be compared like for like until the difference is costed.
Standards and Compliance: Ask, Don’t Assume
In Australia, powered pedestrian doors are governed by access standard AS 5007, while building accessibility is guided by the National Construction Code and standards incorporating AS 1428.1. You are not required to read the standards yourself, but you do need the installer to explain how their design and installation comply, and what compliance records you will receive upon handover.
If the door is on a primary path of travel to an exit or serves as a fire door, bring this up early. Those openings carry additional compliance requirements and may require coordination with your fire services contractor or certifier. A solid installer will identify these requirements during the initial site inspection.
A Fast Way to Align Quotes Side-by-Side
Create a simple evaluation framework. Copy each quote into its own column and map each scope requirement into a row. Tick what is explicitly included, cross what is omitted, and mark a question mark where details are missing. Send the question marks back to each installer in a single email. You’ll often find the gap between the “cheap” and “expensive” quotes narrows significantly.
Essential Comparison Checklist
- Same door type and opening dimensions across all quotations
- Identical activation and safety sensor configurations
- Electrical connection, structural works, and waste disposal specified
- Standard vs. after-hours labor breakdown clearly stated
- Testing, commissioning, and handover documentation listed
- Written warranty terms and ongoing maintenance options provided
Questions Worth Asking at the Site Inspection
- How many daily cycles is this operator rated for, and does it match our traffic volume?
- How does the door behave during a power failure?
- What maintenance is required, and who is qualified to service this system in the future?
- Are replacement parts for this specific model readily stocked in Australia?
- What specific site preparations do you require from us before installation begins?
These questions reveal a lot about the installer’s expertise. Someone who proactively asks about traffic patterns, user profiles, and power access before issuing a quote has already thoroughly mapped out the job.
When to Call a Professional
Engage an automatic door specialist early—before locking in a builder’s allowance, signing off on a lease fit-out plan, or purchasing hardware from a catalogue. That is when scope is best defined: assessing the physical opening, overhead support structure, electrical supply, traffic flow, and user requirements.
Talk to Auto Door Experts
Auto Door Experts supplies, installs, and maintains automatic, security, and industrial door systems for commercial, retail, healthcare, and industrial premises. Based in Prestons, serving all of Sydney and NSW.
Frequently asked questions
| Q Why is one automatic door quote so much cheaper than another?A Usually because the scope is different. Check whether electrical work, glass, sensors, removal of the old door, after-hours labour and commissioning are included in both quotes before comparing price. |
| Q Does an automatic door installation quote include the electrician?A Not always. Some installers include the power connection; others list it as ‘by others’. In NSW, fixed wiring must be done by a licensed electrician, so confirm who’s responsible. |
| Q What documents should I get when the door is installed?A Ask for operating guidance, equipment details, a record of safety testing and commissioning, warranty terms, and the contact for future service. |
| Q Do I need a site inspection before getting a quote?A For an accurate quote, yes. The opening, surrounding wall, power, traffic and user needs all affect the scope, and they’re hard to judge from photos alone. |
| Q Which Australian standard applies to automatic doors?A AS 5007 covers powered doors for pedestrian access and egress. Accessibility requirements also come from the National Construction Code and related standards. Ask your installer how your door addresses them. |
